Maintenance1132−2/A2
Winterthur Gas & Diesel Ltd.
10/ 19
3. Main Bearing Cover
No.1 − Removal
1) Remove the holder(1, Fig. 12) and the
cover (2).
2) Remove the round nuts (2, Fig. 13)
,refer to 1132−1.
3) Remove the oil pipe (1) from the main
bearing cover.
4) Do a check of the bearing clearance,
refer to 0330−1.
5) Do step 8) to step 20) above to install
the thrust device.
6) Attach the lug (94116C, Fig. 14) to the
main bearing cover (1).
7) Attach the shackle (94019G) to the
platform.
8) Attach the chain block (H2) to the
shackle (94019G) and the lug
(94116C).
9) Operate the chain block (H2) to lift the
main bearing cover (1).
2016
Main Bearing − Removal and Installation
Fig. 12
2
1
WCH03014
Fig. 13
Fig. 14
94019G
H2
94019K
1
WCH03014
WCH03021
1
2