Maintenance3326−2/A1
Winterthur Gas & Diesel Ltd.
6/ 13
42) Operate carefully the chain block (H5,
Fig. 11) and the two chain blocks (H3,
H8) to lower the crosshead to the
position shown.
Note: Make sure that the primary load
stays on the geared chain
block (H5).
Note: The guide shoe (2, Fig. 12) can
look different.
43) Remove the two bolts, tab washers and
holding plates (1) from the guide
shoe (2).
44) Attach the two eye bolts (94045-M20)
to the chain (94325) to the crosshead
pin (4).
45) Attach the shackle (94019N, Fig. 13) to
an applicable position on the column.
46) Attach the manual ratchet (H1) to the
chain (94325) and the shackle
(94019N).
47) Apply tension to the manual
ratchet (H1).
48) Operate the manual ratchet (H1) to pull
the crosshead pin (1) until the guide
shoe (2 or 3, Fig. 12) is clear.
2016−10
Crosshead Pin − Removal / Installation / Clearance Checks
Fig. 11
H8
H5
Fig. 12
1
94045−M20
2
3
WCH02437
94325
94325
94019N
H1
1
Fig. 13
4
WCH03035
H3