EasyManuals Logo

Zte ZXR10 2928 User Manual

Zte ZXR10 2928
341 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
ZXR10 2920/2928/2952
(V1.0) Access Switch User Manual Volume I
20 Confidential and Proprietary Information of ZTE CORPORATION
Switch Installation on Desktop
When switch is placed on desktop, install four plastic pads (the
plastic pads and screws are part of the accessories) on bottom
plate of switch. Four pads support switch and form a lower
ventilation channel for power to cool down. It is shown in
Figure
8.
FIGURE 8 INSTALLING PLASTIC PADS
1
2
2
1
1
2
1 Case 2 Pad
Switch Installation onto a Cabinet
To install the switch into the 19-inch cabinet, install a flange to
each of the two sides of the switch shell (the flange and screws
are part of the accessories), as shown in
Figure 9.
Installation
Procedures

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zte ZXR10 2928 and is the answer not in the manual?

Zte ZXR10 2928 Specifications

General IconGeneral
MAC Address Table Size16K
VLAN4K
Jumbo Frame9K
Power SupplyAC 100-240V, 50/60Hz
Power Consumption< 30W
Dimensions440mm x 200mm x 44mm
Operating Temperature0°C to 45°C
Storage Temperature-40°C to 70°C
Operating Humidity10% to 90% non-condensing
Storage Humidity5% to 95% non-condensing
Ports24 x 10/100/1000Base-T ports, 4 x GE SFP ports

Related product manuals