Network cables and plugs
47
1SVC 440 795 M1100
Network cables and plugs If possible use the prepared cables CL-LAD.TK002,
CL-LAD.TK003, CL-LAD.TK004.
The first and last stations in the network must each be
terminated with the CL-LAD.TK009 bus termination resistor.
Connecting the power
supply
CL-AC2 power supply
Figure: 29: AC power supply on the display system
h
For the connection data of device types CL-DC2 with
24 V DC and CL-AC2 with standard voltages of
100 V to 240 V AC, refer to chapter “Technical data”
page 389.
The display system devices run a system test for one
second after the power supply has been switched on.
Either RUN or STOP mode will be activated after this time
depending on the default setting.
NNL
0.6 x 3.5 x 100
L
N
> 1 A
U
e
= 115/230 V h 50/60 Hz
(85 – 264 V h)
I
e
= 70 mA 115 V
35 mA 230 V
Attention!
A short current surge will be produced when switching on
for the first time. Do not switch on the CL-AC2 power
supply via reed contacts since these may burn or melt.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB CL Series and is the answer not in the manual?

ABB CL Series Specifications

General IconGeneral
ManufacturerABB
Rated Control Supply Voltage (Us)24 V DC
MountingDIN Rail
CategoryRelays
Contact ConfigurationSPDT
Coil Voltage24 V DC
Operating Temperature-40°C to +70°C
Electrical Life100 Thousand Cycles
OutputRelay