EasyManuals Logo

Agilent Technologies 7673 User Manual

Agilent Technologies 7673
207 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
2
Setting Up
The purpose of this chapter is to:
Introduce you to the names of the major parts associated with installing
the automatic liquid sampler and some preventive maintenance tips.
Help you set up the automatic liquid sampler and turn on the power.
You must complete the following tasks during installation to be ready to turn
on the power.
1. Install the mounting brackets for the injector and tray, along with any
upgrade parts for the gas chromatograph (GC). Instructions for these
installations are contained in link manuals that are packaged with the
brackets or upgrade parts.
2. Mount the injector and tray on the brackets.
3. Verify that the controller switch settings are correct.
4. Connect the cables for the injector and tray to the controller.
5. Connect the communication cables for the controller, the GC, and the data
handling device.
6. Install the power cord for the controller.
The instructions for tasks 2 through 6 start on page 11.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 7673 and is the answer not in the manual?

Agilent Technologies 7673 Specifications

General IconGeneral
BrandAgilent Technologies
Model7673
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals