defrostinthefollowingconsecutivedefrostgroupisdelayedaccordingly.
The defrosts are continued until the entire chain of controllers has been run through. This completes the
consecutive defrost and all controllers are back in cooling mode. >
Configuration / oarametrisation of consecutive defrost
Theparametrisationofthedefrostisperformedinmenu2-Setpoints–2DefrostZone1.
The first thing to be configured is the function of the controller with regard to the consecutive defrost (Master or
Slave or OFF if the controller does not participate in the consecutive defrost, parameter "FA-Funktion").
Theassociateddefrostgroup(parameterFA-Gruppe) and the CAN bus address of the CD Master
(parameterFA-Master) must be set for the slaves. The CD master is automatically in CD group 1; if it is set to a
different group, this has no effect on the master. Furthermore, the wait time between two group defrosts must
be set on the CD master.