Figure 173: Positions and bolts of the FBUs
1 FBU 1 2 FBU 2 (not valid for servers with
EDSFF SSD subsystem)
9.7.2 Installing an FBU
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver (for cover 2)
Preliminary steps
▶
If applicable, "Removing the front cover with lock" on page 48.
▶
"Shutting down the server" on page
48.
▶
"Disconnecting the power cord" on page 49.
▶
"Getting access to the component" on page 52.
Expansion cards and backup units
252 Upgrade and Maintenance Manual RX2530 M6