Concluding steps
▶
"Reassembling" on page 57.
▶
"Connecting the power cord" on page
62.
▶
"Switching on the server" on page 66.
The recalibration of the FBU starts automatically, and finishes within a
few minutes.
▶
If applicable, "Installing the front cover with lock" on page
66.
9.7.3 Removing an FBU
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver (for cover 2)
CAUTION
▶
Dispose of used battery properly. Keep away from children.
▶
Do not throw flash backup units into the trash can. Batteries must
be disposed of in accordance with local regulations concerning
special waste.
Preliminary steps
▶
If applicable, "Removing the front cover with lock" on page
48
.
▶
"Shutting down the server" on page
48.
▶
"Disconnecting the power cord" on page 49.
▶
"Getting access to the component" on page 52.
Expansion cards and backup units
258 Upgrade and Maintenance Manual RX2530 M6