DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
7-32 Section 7-4 - Performing Front End (FE) Diagnostics
5.) Trackball to the Start button and press Set.
The Full RFI Test commences. While the test proceeds, the name of the test currently in progress
(Full RFI Test) is displayed in the Execute field and the current Loop # and specific test are shown
below. The messages Init Done and Please Wait are displayed beside the progress bar in the
Status area:
As the testing sequence progresses, the progress bar will advance to reflect the test progress. The
LED on the RFI status indicator in the Data Flow map will be highlighted in the appropriate color to
indicate the current test status, as follows:
Green: All recommended tests for these components have been completed and no problems
were identified.
Red: Problems were identified in these components during the performance of the test.
Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
6.) At any stage, trackball to the Pause button and press Set, if required.
7.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the Full RFI Test sequence is complete:
- the Diagnostic Test window displays the Finished message
- the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in the example in Figure 7-12.
8.) If necessary, use the scroll bars and/or arrows to scroll through the list of Test results.
Note: For the Full RFI test, four tests are performed in the test sequence; these are listed in the
Tests window as shown in Figure 7-12. For each currently-selected test (for example, RFI
FE Cache Test) the corresponding report is listed in Reports on the right.
For details of each report, refer to the following explanations:
- View Test Log - RFI Cache Test on page 7 - 35
- View Test Log - RFI Demodulator Short Test on page 7 - 41
- View Test Log - RFI Analog Circuits Test on page 7 - 38
- View Test Log - RFI Audio Test on page 7 - 44
9) When done, trackball to the Exit button and press Set to close the View Report window.
Figure 7-12 View Test Log - Full RFI Test