GE HEALTHCARE
DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
8-26 Section 8-2 - External Component Replacement Procedures
6) Return the HVPS as described in the HVPS Installation Procedure on page 8 - 48.
7) Return the BEP as described in the BEP Installation Procedure on page 8 - 42.
8) Return the TR32 and RFI Boards as described in the TR32 and RFI Boards Installation Procedure
on page 8 - 37.
9) Return the P&M Board as described in the P&M (Probe and MUX) Board Installation Procedure on
page 8 - 31.
10) Return the Control Panel and Keyboard as described in the Control Panel and Keyboard Installation
Procedure on page 8 - 11.
11) Return the hard disk as described in the Hard Disk Installation Procedure on page 8 - 8.
12) Return the bearing handle as described in the Bearing Handle Installation Procedure on page 8 - 4.
13.)Re-install the battery as described in the Battery Installation Procedure on page 8 - 6.
14.)Proceed to perform the following functionality tests:
- SafeLock Cart - Grounding Continuity on page 10 - 23 - only if the Vivid i n/ Vivid q N system
is currently mounted on the SafeLock cart
- SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
- Calibration Tests on page 7 - 25
- Full System Test on page 7 - 10