EasyManua.ls Logo

GE Vivid i n - Page 559

GE Vivid i n
740 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION FQ091013, REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-31
5.) Lift the P&M Board upwards away from the Bottom Assembly and remove it completely, as shown
in Figure 8-35 below.
8-3-1-5 P&M (Probe and MUX) Board Installation Procedure
NOTE: When performing the following installation procedure steps, it may be helpful to review the appropriate
movie clips previously referenced in the P&M (Probe and MUX) Board Removal Procedure.
CAUTION: When installing boards, ESD may cause damage to a board. Always have the ESD hand
strip connected to the machine chassis and to your hand.
1) Return a new P&M Board to the system, pushing it downwards into position on the Bottom
Assembly. Make sure it is properly seated before returning and fastening the two screws (previously
removed). Refer to Figure 8-35 and Figure 8-34, above.
2.) Return and fasten the four screws to secure the P&M Board to the RFI Board, as shown in
Figure 8-33 on page 8-30.
3.) Return the Control Panel and Keyboard, as described in the Control Panel and Keyboard
Installation Procedure on page 8 - 11
4.) Return the bearing handle, as described in the Bearing Handle Installation Procedure on page 8 - 4.
5.) Proceed to perform the following functionality tests:
- SafeLock Cart - Grounding Continuity on page 10 - 23 - only if the Vivid i n/ Vivid q N system
is currently mounted on the SafeLock cart
- SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
- Calibration Tests on page 7 - 25
- Full System Test on page 7 - 10
Figure 8-35 Removing the Probe and MUX Board from the Bottom Assembly

Table of Contents

Related product manuals