Cleaning, disinfection and maintenance
Fig. 212: Right bafe sheet
1 Right bafe sheet
7. Disengage the right bafe sheet upwar
d and then remove
toward the front.
Installation is done in the opposite order.
When installing the upper bafe sheet, push this upward and fasten
with the two knurled screws. It must be ush with the ceiling of the
interior.
7.2 Disinfection
■ If infectious material gets into the interior, disinfect it immedi-
ately
.
■ Ingredients of suitable disinfectants: Ethanol, n-propanol,
isopr
opyl alcohol, ethyl hexanol, corrosion inhibitors.
■ After using disinfectants, remove the disinfectant residue by
wiping with a damp cloth.
■ The surfaces must be dried immediately after disinfecting.
WARNING
Risk due to insufcient disinfection after contamina-
tion!
Ther
e is a risk of infection for the user. Observe your
laboratory rules (hygiene plan, etc.) for handling bio-
logical agents.
7.3 Removal of radioactive contaminants
■ The agent must be specically labelled as being an agent
for r
emoving radioactive contaminants.
■ Ingredients of suitable agents for removing radioactive con-
taminants: anionic tensides, non-ionic tensides.
■ After removing the radioactive contaminants, remove the
agent r
esidue by wiping with a damp cloth.
■ The surfaces must be dried directly after removing the radi-
oactive contaminants.