EasyManua.ls Logo

HP HPE Synergy 12000 Frame

HP HPE Synergy 12000 Frame
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing components from the Removing components from the frameframe
Before installing the frame into the rack, you must remove all of the pre-installed components from the front and rear of the frame.
Because a fully-populated frame can weigh up to 249.50 kg (550.00 lb), removing the components from the frame makes moving and
installing the frame easier.
With the frame still on the pallet, remove all components from the front and rear of the frame.
IMPORTANT: IMPORTANT: To ensure the correct configuration when installing components, be sure to note the location of each
component before removing it from the frame.
For specific instructions concerning removing the components, see the HPE Synergy 12000 Frame Maintenance and Service Guide.
Removing components from the frame 69

Table of Contents

Other manuals for HP HPE Synergy 12000 Frame

Related product manuals