EasyManua.ls Logo

Hypertherm Powermax 125 - Operating the Powermax; Connect the Electrical Power, Gas Supply, and Torch Lead

Hypertherm Powermax 125
317 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44 Powermax125 Service Manual 808070
3 Basic System Operations
Operating the Powermax
Follow the steps below to begin cutting or gouging with the system.
This section provides basic operating instructions. Before operating your system in a
production environment, refer to Hand Torch Setup on page 51 or Machine Torch Setup
on page 67.
Connect the electrical power, gas supply, and torch lead
For information on connecting the proper plug to the power cord, refer to Power Supply Setup on page 29.
Plug in the power cord and connect the gas supply line. For more information about the electrical requirements and the
gas supply requirements of the Powermax, see Power Supply Setup on page 29. To connect the torch, push the
FastConnect connector into the receptacle on the front of the power supply. You will attach the work lead in the next step.
CCC units do not ship with a power cord. To maintain CE certification, install power cord
kit 228886.
Torch lead
Work lead
Power cord (does not
ship with plug)
Gas supply line

Table of Contents

Other manuals for Hypertherm Powermax 125

Related product manuals