A6-3-Analyser start up after a long stoppage period
•
Perform the initial start up.
•
Install new ancillary reagents
•
For systems using AP Substrate, install a new bottle of AP Substrate in its corresponding position.
•
Once the new bottles are installed, a message proposing an automatic priming is displayed:
•
Click on to confirm the priming of the product(s).
The analyser starts the priming sequence.
•
Request twice ALL SYSTEM-FULL PRIMING from the menu:
•
Install a CCS reagent cartridge.
•
Then perform the qualification profile.
!
Wait for 40 minutes after installing CCS reagent cartridge before starting qualification profile, as
the CCS reagent cartridge temperature must be allowed to equilibrate.