Table 53: Site Preparaon Checklist
(Connued)
Item or Task For More Informaon Performed by Date
Verify that your rack or cabinet meets the
minimum requirements for the installaon
of the switch.
• "Rack Requirements" on
page 132
• "Cabinet Requirements" on
page 134
Plan rack or cabinet locaon, including
required space clearances.
"Clearance Requirements for
Airow and Hardware
Maintenance for EX4300
Switches" on page 135
Secure the rack or cabinet to the oor and
building structure.
Cables
Acquire cables and connectors:
• Determine the number of cables
needed based on your planned
conguraon.
• Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between
the hardware components being
connected.
Plan the cable roung and management.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings