Site Preparaon Checklist for EX4300 Switches
The checklist in Table 53 on page 122 summarizes the tasks you need to perform when preparing a site
for EX4300 switch installaon.
Table 53: Site Preparaon Checklist
Item or Task For More Informaon Performed by Date
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
"Environmental Requirements
and Specicaons for EX Series
Switches" on page 124
Power
Measure the distance between external
power sources and the switch installaon
site.
Locate sites for connecon of system
grounding.
Calculate the power consumpon and
requirements.
"AC Power Supply
Specicaons for EX4300
Switches" on page 103
"DC Power Supply
Specicaons for EX4300
Switches" on page 118
Hardware Conguraon
Choose the number and types of switches
you want to install.
"EX4300 Switches Hardware
Overview" on page 2
Rack or Cabinet
122