Site Preparaon Checklist for EX4300 Switches
The checklist in Table 53 on page 122 summarizes the tasks you need to perform when preparing a site
for EX4300 switch installaon.
Table 53: Site Preparaon Checklist
Item or Task For More Informaon Performed by Date
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
"Environmental Requirements
and Specicaons for EX Series
Switches" on page 124
Power
Measure the distance between external
power sources and the switch installaon
site.
Locate sites for connecon of system
grounding.
Calculate the power consumpon and
requirements.
• "AC Power Supply
Specicaons for EX4300
Switches" on page 103
• "DC Power Supply
Specicaons for EX4300
Switches" on page 118
Hardware Conguraon
Choose the number and types of switches
you want to install.
"EX4300 Switches Hardware
Overview" on page 2
Rack or Cabinet