5-1
CHAPTER 5 Maintenance of the 994-X
This chapter describes preventative maintenance steps for KVAL 994-X The content is geared to
guide technicians to keep a regular maintenance schedule for your KVAL machine. Keeping your
KVAL machine maintained is an important piece for successful operation of your door production
process.
Section Name Summary Page
Maintenance Schedule
This section describes maintenance on the machine. The
maintenance is broken into ma
chine cycle times and
describes the suggested maintenance steps to perform.
• 300 Cycles
• 600 Cycles
• 3,000 Cycles
• 12,000 Cycles
• 72,000 Cycles
Page 5-2
Tool Changing
Schedule
Describes the suggested time frame to change the tools
in the machine
Page 5-14
Lubrication
Requirements
Th
is section describes the lubrication requirements for
the machine,
including types of lube to use. This section
includes:
• Linear Bearings, Flange Bearing, and Pillow Blocks
• Gear Motor Lubrication Requirements
• Ball Screws
• Description of Air Input
• Adjusting the Air Line Lubricator
• Priming the Air Line Lubricator
Page 5-18
Replacing Bits
Procedures on how to change bits on the machine.
Includes ‘Good Prac
tices’, and Torque values.
Page 5-21