NTP-004
: System Turnup 363-206-305
Page 4 of 6 Issue 3, June 2000
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
DO ITEMS BELOW IN ORDER LISTED. . . . .FOR DETAILS, GO TO
6. At each DS1 terminating node, use the set-t1: command to
set the characteristics of the DS1 port of the circuit being
established.
7. At each DS1 terminating node, make the appropriate cable
connection(s) to the DS1 cross-connect point(s) or equivalent
connection point(s) for the circuit being added.
8. Verify that no LEDs or alarms are activated. If any LEDs or
alarms are activated, refer to
Trouble Clearing: IXL-001
and
follow the appropriate trouble-clearing procedure.
9.
NOTE:
DS1 cross-connections have to be made at each shelf to
configure the transmission path for each DS1 circuit being
established. Either terminating (drop) cross-connections are
made at terminating nodes and pass-through
cross-connections are made at intermediate nodes.
NOTE:
The following commands may be used to delete, enter, and
retrieve cross-connections: dlt-crs-vt1, ent-crs-vt1,
and rtrv-crs-vt1. See the "Commands and Reports"
section of this manual for a description of commands. See
"Cross-Connection Provisioning" in the "Administration and
Provisioning" section of this manual for more information on
cross-connection provisioning.
Determine the necessary cross-connections for each node from
the work order or circuit order.