NTP-030
: System Turnup 363-206-305
Page 8 of 10 Issue 3, June 2000
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
DO ITEMS BELOW IN ORDER LISTED. . . . .FOR DETAILS, GO TO
19. Repeat this procedure for all OC-3 optical spans being
established in the DDM-2000 OC-3 network. Ensure that the last
optical span connected to the OC-3 host shelf is connected to an
OLIU
in the opposite slot as the one in the first OC-3 span (for
example, slot
1
for the first span and slot
2(P)
for the second
span).
20.
NOTE:
Establishing service requires that the proper slots in each
terminating node be properly equipped with the correct
circuit pack(s) for the type of service being established. It
also requires numerous cross connections in each of the
nodes representing the path of the required service.
Additionally, transmission tests should be performed to verify
the continuity and quality of the established circuit.
The OC-3 linear extension is now ready for initial service to be
established.
Initial DS1 Service [
System Turnup: NTP-004
]
Initial T1 Service [
System Turnup: NTP-013
]
Initial HDSL Service [
System Turnup: NTP-017
]
Initial DS3 Service [
System Turnup: NTP-025
]
STS-3c Service [
System Turnup: NTP-016
]