363-206-305 Circuit Order:
NTP-033
Issue 3, June 2000 Page 7 of 12
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
DO ITEMS BELOW IN ORDER LISTED . . . . FOR DETAILS, GO TO
26.
NOTE:
When the 29-Type OLIU is installed in this step, an
unexpected CP type status alarm will occur. When the
fibers are reconnected, the inc. OC12 LOS alarm will clear
at the connecting Node.
At Node 3, install a 29-Type OLIU into MAIN-1 OLIU slot and
reconnect optical fibers.
27. Remote login to Node 4 and switch STS-1 and/or VT1.5 path from
MAIN-1 to MAIN-2 with the switch-path-sts1: and/or
switch-path-vt1: commands.
28. Use the
rtrv-sync;
command to verify that MAIN-2 is the
active circuit pack, and active reference/line.
29. Use the
switch-sync:s=src;
and
switch-sync:s=circuitpack;
to force timing to MAIN-2.
30. At Node 3, switch STS-1 and/or VT1.5 path from MAIN-2 to
MAIN-1 with the switch-path-sts1: and/or
switch-path-vt1: commands.
31.
NOTE:
A CP removed alarm will occur and an inc. OC3 LOS
alarm will occur at the connecting Node when the MAIN 2(P)
OLIU is removed from this Node. Other nodes will receive
inc. VT and STS AIS alarms.
At Node 3, remove optical fibers and lift the faceplate latch of
MAIN-2 OLIU for next span being established, then remove
MAIN-2 OLIU.