363-206-305 Trouble Clearing:
TAP-111
Issue 3, June 2000 Page 1 of 4
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
Clear OLIU or Fiber Trouble
Path Protected Ring/1+1 Linear Extensions
1.
!
WARNING:
Open optical connectors may emit invisible laser radiation. Do not view
beam with optical instruments. Avoid direct exposure to the beam. Use of
controls or adjustments or performance of procedures other than those
specified herein may result in hazardous radiation exposure.
!
CAUTION:
When removing
OLIU
circuit packs or replacing fiber, ensure that all
VT/STS paths are active on the
OLIU
and fiber that is
NOT
being
removed or replaced. When available, use a CIT and the
switch-path-( ):all:pri=manual
command to switch all VT/STS
paths to the
OLIU
and fiber that are not being removed or replaced. It is
also recommended to login to the far end of the
OLIU
and use the
switch-path-( ):all:pri=manual
command to switch all VT/STS
paths to the
OLIU
and fiber that are not being removed or replaced. Be
aware that if locked cross-connections are used, service will be
interrupted when an
OLIU
is replaced.
!
CAUTION:
If timing source has been previously set to optical line (main-1 or main-2)
that has failed, use the
set-sync:src=main-1
or
main-2
command
to select timing source from good optical line.
NOTE:
A lighted FAULT LED on the OLIU indicates that either the receiver, the
transmitter, or both has failed. A flashing FAULT LED on the OLIU
indicates that either the near-end receiver, far-end transmitter, or
incoming (receive) fiber has failed. In a Path Protected Ring network,
both OLIUs are normally ACTIVE. One OLIU carries service on one path
of the ring and the other OLIU carries service on the other path. If
possible, log into shelf associated with source address (for example,
main-2) of inc. OC1 LOS, inc. OC3 LOS, or inc. OC12 LOS, etc.
to see if circuit pack is removed or failed.
Was OLIU(s) removed or being replaced or installed when alarm occurred?
If YES, continue with Step 2.
If NO, proceed to Step 8.