363-206-305 Detailed Level Procedure:
DLP-513
Issue 3, June 2000 Page 7 of 8
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
BBG4/BBG4B/BBG19 DS3
16. Determine from office records the length of the DS3 cabling between the
DDM-2000 and the DSX-3 cross-connect point.
17.
NOTE:
The only option settings on the DS3 circuit pack are the LBO settings
shown in Figure 5. If there are other jumpers on the circuit pack similar to
the LBO jumpers, they are factory test points and should be ignored.
Refer to Table F and Figure 5 and install the DS3 option jumpers.
18. STOP. YOU HAVE COMPLETED THIS PROCEDURE.
Figure 5. DS3 Option Settings
Table F DS3 LBO Settings
Cable Length (Ft)
LBO Settings734D 735A
0 to 225 0 to 125 LBO IN (ON)
>225 to 450 >125 to 250 LBO OUT

Table of Contents