DLP-526
: Detailed Level Procedure 363-206-305
Page 4 of 18 Issue 3, June 2000
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
Figure 4. Sample Report From rtrv-map-neighbor Command (Release 3.1
and Later)
2. Verify system configuration is same as specified on work order or circuit order.
For example, see Figures 5 through 13.
3.
NOTE:
Cross-connections consist of drop and pass-through connections. For
example, in Figure 5, drop connections are made at Nodes 1, 4, 5, and
the FiberReach node. Pass-through cross-connections are made at
Nodes 2, 3, and 6. Also, cross-connections must be made in all
interconnected rings, including other DDM-2000 OC-3 rings, DDM-2000
OC-12 rings, and FT-2000 OC-48 rings, as required.
From work order or circuit order, determine the terminating (drop) nodes for
the service being established.
4. From work order, circuit order, and the sketch made in Step 1, determine the
pass-through nodes for the service being established.
5. From work order or circuit order, determine the host OC-3 or OC-12 node(s)
that connects to the OC-1 FiberReach ring(s).
*/
Site6NE1/* Network Map for
Site6NE1 FiberReach
39 840F 80 000000 0000 0000 0000 08006alad06e 00
Site7NE1 main-1
39 840F 80 000000 0000 0000 0000 08006a1ad06f 00
Site5NE1 main-2 ? N
39 840F 80 000000 0000 0000 0000 00000e3a0372 00
TID Connected Thru Product Type Level 2 IS DCC
NSAP
======================================================================
======================================================================