DLP-532
: Detailed Level Procedure 363-206-305
Page 2 of 4 Issue 3, June 2000
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
2.
NOTE:
The
197A
test set is intended to test batteries that are fully charged. A
minimum of two days must be allowed between the time the batteries
(new or replacement) are put on high rate charge and this test is made.
After testing is completed, the batteries must be put on high rate charge
using the
337A BATTERY CHARGER
.
Remove cover from
197A
test set.
3. Check
197A
test set for proper operation (if not already performed).
Reference:
DLP-529
4. Ensure that system(s) associated with batteries to be tested has AC power
available (
PMN
or
P/M
indicator on
BCU
circuit pack not lit).
5. On
337A BATTERY CHARGER
associated with batteries to be tested, is
HIGH RATE CHG/ON
indicator lit?
If
YES
,
then continue with
Step 6.
If
NO
, then proceed to
Step 7.
6. Batteries are on high charge and may require up to 24 hours to charge. Do not
perform this procedure until
HIGH RATE CHG/ON
indicator on
BATTERY
CHARGER
goes off.
7.
!
CAUTION:
Service interruption will occur if batteries are disconnected and AC power
is not available.
Disconnect battery leads of batteries to be tested from battery shelf.
8.
NOTE:
Under normal conditions, when the first battery is connected, the
following occurs: (a) The test set
TIME
display indicates
00 MIN:00 SEC
;
(b) the status display indicates which test set
BATT
plug the battery is
connected to, status of the battery (
GOOD
or
REPLACE
), and the
READY
indicator lights; (c) test set fan operates.
At test set connector head (Figure 1), connect battery leads (up to four) to
BATT 1, 2, 3,
and
4
plugs.