NTP-002
: System Turnup 363-206-305
Page 2 of 2 Issue 3, June 2000
DDM-2000 F
IBER
R
EACH
N
ARROWBAND
S
HELF
DO ITEMS BELOW IN ORDER LISTED. . . . . FOR DETAILS, GO TO
4. Unlock the electronics compartment door using the 216-C tool, if
required.
DLP-502
5. Install −48 V DC
PCU
(
AUA432
), if not performed in
Acceptance:
NTP-002
.
DLP-503
6. Install
RGU
(
AUA413
/
AUA423
).
7.
NOTE:
At this point, the NE and the FAIL indicator on the
DSXBIU
will be lit. All other circuit packs should not have any
indicators.
DLP-505
Install
DSXBIU
.
DLP-506
8. Install
CDTU
(
AUA421
).
9. Verify that the DS1 signal is present at the DT using DS1 test set.
10.
NOTE:
When this link is established there will be a 4-hour wait for
the
DSXBIU
to download software if nor already done.
Turn-up the DSX-1 links to the
SLC
-2000.
DLP-504
11. Install channel units.
12. Update office records.
13.
STOP. YOU HAVE COMPLETED THIS PROCEDURE
.