EasyManua.ls Logo

Lucent Technologies FiberReach DDM-2000 - Page 1828

Lucent Technologies FiberReach DDM-2000
1896 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TAP-105
: Trouble Clearing 363-206-305
Page 2 of 2 Issue 3, June 2000
DDM-2000 F
IBER
R
EACH
N
ARROWBAND
S
HELF
10. Has the replacement unit that was installed in
Step
8
been replaced while
performing this procedure?
11. Press
LED TEST
button on
DSXBIU
.
Requirement:
FAIL
LED lights on
PCU
.
If LED does not light, replace the
PCU
by repeating this procedure starting at
Step
4
.
12. Measure voltage at test points
48VDC
and
48VDC RETURN
.
Requirement: 42 to 60 V DC.
13. Were
PCU
voltage requirements met?
14. Remove your wrist strap, secure the electronics compartment.
15.
STOP. YOU HAVE COMPLETED THIS PROCEDURE
.
If
YES
, escalate to next level of support.
If
NO
, replace unit by repeating this procedure starting at
Step
4
.
If
YES
, continue with
Step
14.
If
NO
, replace
PCU
by repeating this procedure from
Step
4
.

Table of Contents

Related product manuals