EasyManua.ls Logo

Lucent Technologies FiberReach DDM-2000 - Page 1847

Lucent Technologies FiberReach DDM-2000
1896 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
363-206-305 Detailed Level Procedures:
DLP-503
Issue 3, June 2000 Page 3 of 4
DDM-2000 F
IBER
R
EACH
N
ARROWBAND
S
HELF
9. Is FAIL indicator lit?
10. Contact the responsible installation group to locate wiring troubles.
11. Measure RGU AC and DC ringing voltages between 20 Hz and GND.
Requirement: AC ringing voltage: 75 to 85 V AC RMS
DC ringing voltage: 42 to 70 V DC.
12. Measure RGU DC voltage between 48V and GND.
Requirement: DC voltage: 42 to 60 V DC.
13. Were RGU voltage requirements met?
14. If you are not continuing with the turn up procedure, disconnect your wrist
strap, secure the electronics compartment door, and replace the NBS
enclosure.
15. STOP. YOU HAVE COMPLETED THIS PROCEDURE.
If YES, continue with Step 10.
If NO, proceed to Step 11.
If YES, continue with Step 14.
If NO, repeat this procedure from Step 8.

Table of Contents

Related product manuals