EasyManua.ls Logo

Lucent Technologies FiberReach DDM-2000 - Page 1867

Lucent Technologies FiberReach DDM-2000
1896 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
363-206-305 Detailed Level Procedures:
DLP-507
Issue 3, June 2000 Page 7 of 8
DDM-2000 F
IBER
R
EACH
N
ARROWBAND
S
HELF
38. At the LDS, verify that the correct directory number has been assigned to LLN
under test. After the problem has been resolved, repeat from Step 36.
39. Lift the telephone handset during the ringing period of the ringing cycle.
40. Does the ringing trip normally?
41. Replace the channel unit and repeat from Step 16.
42. Is this the last drop to be tested?
43. Disconnect the test telephone and remove the VOM leads from TB1. Verify the
channel service and telephone number assignments for the next drop to be
tested. Repeat this procedure from Step 6 for drops 24, 25, and 48.
44. Disconnect the test telephone, remove the VOM leads from TB1, secure the
drop terminal access door, electronics compartment door.
45. STOP. YOU HAVE COMPLETED THIS PROCEDURE.
If YES, proceed to Step 42.
If NO, continue with Step 41.
If YES, proceed to Step 44.
If NO, continue with Step 43.

Table of Contents

Related product manuals