EasyManuals Logo

Mitsubishi MELSEC Q Series User Manual

Mitsubishi MELSEC Q Series
664 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #179 background imageLoading...
Page #179 background image
5
SETTINGS AND PROCEDURES BEFORE OPERATION
5.7 Battery Specifications, Installation and Replacement
5.7.2 Installing battery
5 - 31
1
OVERVIEW
2
SYSTEM
CONFIGURATION
3
SPECIFICATIONS
4
FUNCTIONS
5
SETTING AND
PROCEDURES
6
I/O NUMBER
ASSIGNMENT
7
MEMORIES AND
FILES
8
INSTALLING /
UNINSTALLING
5.7.2 Installing battery
The battery for the C Controller module is shipped with its connector disconnected.
Connect the connector before use.
Figure 5.32 Battery installation procedure
IMPORTANT
Be sure to install the battery before starting operation.
If having operated the module without the battery, set the clock data and shutdown the
module. (
Section 5.7.4)
Completed
Put the battery connector onto the
connector pin on the case. Be sure
that the orientation is correct.
Open the C Controller module's
bottom cover.
Confirm that the battery is loaded
correctly.
Battery
Connector
Connector
stopper
C Controller module's

Table of Contents

Other manuals for Mitsubishi MELSEC Q Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi MELSEC Q Series and is the answer not in the manual?

Mitsubishi MELSEC Q Series Specifications

General IconGeneral
BrandMitsubishi
ModelMELSEC Q Series
CategoryController
LanguageEnglish

Related product manuals