9.2 C Controller Setting Utility
9.2.12 Reading initial setting file and importing multiple CPU parameters
9
UTILITY OPERATION
9.2.12 Reading initial setting file and importing multiple CPU parameters
This section explains how to load the initial setting file of the intelligent function module
and how to utilize the multiple CPU parameters.
(1) How to display the screen
Perform any of the following operations to open the "Project open" screen.
• Click the button of the <<System setting>> tab.
• Click the button of the <<I/O assignment setting>>
tab.
• Click the button of the <<Multiple CPU setting>>
tab.
(2) Explanation of screen
The project of the setting data can be selected.
(3) Precautions for utilizing the existing setting data
(a) When moving the setting data of GX Developer which were set by another per-
sonal computer to the development environment (personal computer), move the
project folder of GX Developer.
If only the file is moved, the project cannot be specified.
(b) Refer to the following for the precaution for use of various GX Configurators.
Section 2.2.2
Figure 9.50 Project open screen
Table9.32 Explanation of Project open screen
Item Description
Project drive Select the drive where the project exists.
Drive/Path Enter the drive and path of the project.
Project name Enter the project name to be read.
button
Reads the project.
button
Ends without reading the project.
Load initial setting file
Import multiple CPU parameter
Import multiple CPU parameter
Open
Cancel