MOOR INSTRUMENTS moorLDI2 RESEARCH USER MANUAL
15
3. moorLDI2 UNPACKING AND ASSEMBLY
The moorLDI2 will initially be installed by a Moor Instruments engineer or approved representative.
The following instructions should be followed for subsequent installations.
The various stages of assembly prior to operating the moorLDI2 are:
a.
Stand assembly, instructions for the moorLD-BS1 (basic stand) or moorLDI-DS2 (desktop stand
with ratchet winder height adjustment) stand assembly are included with the stand, for the
moorLDI-MS2 (clinical mobile stand), refer to Section 3.1.
b.
Unpacking the blue plastic transport case. Connection of Scan Head to Control Box using
either a wiring loom (clinical mobile stand) or separate leads (all other stands). Refer to Section
3.2.
c.
Installation of framegrabber card or Firewire card. Note: if you have purchased a Panel PC
Kit (moorLDI-PPC) from Moor Instruments then the framegrabber card will be pre-installed.
Refer to Sections 3.3 and 3.4.
d.
Cable connections (Refer to section 3.5).
3.1
STAND ASSEMBLY
3.1.1
SUMMARY CLINICAL MOBILE STAND – moorLDI-MS2
Note: a separate manual is supplied with the mobile stand. The following is an additional reference.
WARNING: the mobile clinical stand is heavy. Assembly by two persons is advised.
The Base Frame
This part consists of an 'H' frame and 4 swivel and lock wheels. The H frame also has a plate with 4
bolt holes and registration knob for attaching the vertical columns.
The standard H frame is supplied with the wheels attached (4 screws per wheel).
The Vertical Column
The vertical columns are supplied in two parts: lower and upper column assemblies. The winder box
is usually attached to the upper column assembly.
Lock the wheels of the H frame.
Mount the lower column assembly onto the H frame, taking care to align correctly the hole for the
registration knob. Secure all 4 bolts loosely then tighten all.
Attach upper column assembly (aligning the black ratchet track) and secure by tightening the two
cross-head knobs at the top.