VBA23001-R.3762.A
- A87 ・ D90 -
Inspection and Adjustment for AE ACCURACY
Writing in Initial values.
When MAin PCB is replaced.
Inspection and Adjustment for AE CCD POSITION.
Adjustment for Battery Level Check.
Inspection and Adjustment for AE ACCURACY.
Inspection and Adjustment for APERTURE CONTROL ACCURACY.
Inspection and Adjustment for BUILT-IN SB LIGHT VOLUME .
Inspection and Adjustment for AE SENSOR .
When MAin PCB is not replaced.
All the adjustments will be made sequentially.
Select adjustment items individually.
Caution:
When the main PCB is replaced, write the initial values, and update the version. Then, write the initial values again.
①
AE-CCD positioning inspection/adjustment (
For device and details, refer to Page A69.
)《
USB communication
》
Device
SHUTTER TESTER EF-1 (CE)
J19123
LENS AF50/1.4D
②
Inspection and adjustment of AE sensor
《
USB communication
》
Caution: Whenever the shutter unit is disassembled/replaced or the main PCB is replaced, make this adjustment.
When performing "obtain of AE sensor reference value", set the metering mode to "Multi-pattern".
AE inspection and adjustment