EasyManuals Logo

Q2 Q2A User Manual

Q2 Q2A
866 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #85 background imageLoading...
Page #85 background image
Electrical Installation
3
3.4 Main Circuit Terminal Block Wiring
SIEPYEUOQ2A01G AC Drive Q2A Technical Manual 85
6. Install the front cover and the keypad to their initial positions.
Wiring the Main Circuit Terminal Block for Drive Models 2257 - 2415, and 4208 -
4675
Wire the main circuit terminal block correctly as specified by the instructions in the manual.
Read these instructions before wiring the terminal block.
Notes on Wiring the Main Circuit Terminal Block
Do not shake the electrical wire too much.
Be sure to use only wires with the correct size, stripped wire length, and tightening torque as specified by the
manufacturer.
Use tools that fit the shape of the screw head to tighten and loosen the terminal block screws.
Make sure that there are no loose stranded wires or frayed wires after wiring is complete.
Main Circuit Terminal Block Wiring Procedure
The keypad and front cover must be removed before wiring the main circuit terminal block.
1. Remove the screws on the terminal block cover and pull the terminal block cover away from the drive. Pull
the wiring cover away from the drive to remove the wiring cover after removing the terminal block cover.
A - Terminal block cover B - Wiring cover
Figure 3.27 Remove the Wiring Cover
2. Remove the terminal block nut.
A - Nut
Figure 3.28 Remove the Terminal Block Nut

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Q2 Q2A and is the answer not in the manual?

Q2 Q2A Specifications

General IconGeneral
BrandQ2
ModelQ2A
CategoryController
LanguageEnglish