Mounting and installation of the compact control pane
5
224 | 354
5.34 Operating add-on with 20 zones EVAC-NL [NL]
Figure 121: Example: Installation of the operating add-on with 20 zones EVAC-NL
1 Operating add-on FCM2008-N1 [NL]
2 EVAC-NL operation FTO2007 (slave)
3 EVAC-NL operation FTO2007 (master)
4 Holes for operating add-on fixing screws
5 Hinges of operating add-on
6 Periphery board (2-loop or 4-loop depending on type of station)
7 Existing operating unit
8 Mounting holes for the operating add-on
X1
8
8