5.33 Batteries
Guidelines
WARNING
Switching batteries in parallel
Risk of explosion and fire
Never connect batteries in parallel!
If you need more power, you must use batteries with a higher capacity.
The batteries must meet the predefined specifications. You will find further
information in document 008843.
Batteries must be installed so that they cannot leak. The openings for cables in
the back box must not be broken out (EN 60950-1).
If two housings are installed and attached one under another, the batteries
must be installed in the bottom housing.
Mounting steps
NOTICE
Danger of short circuit
Potential damage to hardware
The supplied jumper wire must not be connected until the time of
commissioning.
Note the polarity of the supply: Red cable = positive pole; blue cable =
negative pole
1. Place the batteries on base of the rear panel.
2. Connect the unconnected cable ends of the secondary cabling of the power
supply to the poles of the batteries:
3. Red cable on positive pole of the left battery
4. Blue cable on negative pole of the right battery
a The station is then ready for commissioning. You will find information about
commissioning in document 009052.