Mounting and installation of the compact control panels
Mounting and assembling a station
5
68 | 354
5.2.3.4 Connection with EU socket
Figure 30: Mains wiring with EU socket taking example of fire control panel FC2040-BB
1 Mains cable (feed from above)
2 Strain relief clamp
3 Ground on the rear panel
4 Disconnect terminal
5 Primary cabling for power supply
6 Ground cable (yellow/green) pre-assembled
PE Protective conductor connection (terminal 2)
L1 External conductor (terminal 3)
N Neutral conductor (terminal 4)
5.2.4 Installing the operating unit and the operating add-on
This chapter describes how to assemble the operating units.
Prerequisites
● The housing has been installed.
● The operating unit options are fitted.
PE
L1
2
3
5
6
1