Setup of the compact control panels
Operating unit, operating add
on and cover cap (packaging unit)
3
39 |
Building Technologies
3.4 Operating unit, operating add-on and cover cap
(packaging unit)
The operating unit and the optional operating add-on are supplied together with the
cover cap as a separate packaging unit.
3.4.1 Operating units and operating add-on
The operating unit is part of every station. In the Comfort housing the operating unit
is installed in the upper section of the housing. The operating add-on is installed
either in the bottom part of the Comfort or Large housing or in an additional empty
housing.
In the operating units, MP3.0 uses the PMI & mainboard FCM2004 and also the
PMI & mainboard FCM2027. You will find detailed information about this in
document 008837.
Figure 10: Rear view of operating unit (without options) with PMI & mainboard FCM2027
Figure 11: Rear view of operating unit (without options) with PMI & mainboard FCM2004
1 Support plate
2 PMI & mainboard
3 Mounting holes of operating unit
4 Lug with securing clip for ribbon cable
5 Hinge
5
4
1
2
3
3
5
5
4
1
2
3
3
5