Mounting and installation of the compact control panels
Network module (SAFEDLINK)
5
131 |
Building Technologies
5.14 Network module (SAFEDLINK)
5.14.1 Installation
This component is installed in exactly the same way as for the operating units
with the PMI & mainboard FCM2004 and the PMI & mainboard FCM2027.
If you are installing only one network module (SAFEDLINK) FN2001-A1, you must
do so in the left-hand slot (X13).
When two network modules are used (SAFEDLINK) FN2001-A1, installation is
identical for both.
Figure 60: Installation of both network modules (SAFEDLINK)
1 Network module (SAFEDLINK) on X13 (master module)
2 Fixing screws (2 pieces)
3 Mounting links on support plate
4 Nut for cable gland (2 per module)
1
5 Cable gland (2 per module)
1
6 Degraded mode network module (SAFEDLINK) on X12
7 Connector X1 on the rear of the network module
X3 Connection terminal FCnet
X13 Plug-type connection for main module
X12 Plug-type connection for degraded mode module
1
When using shielded cables, the cable screw connections are needed to secure
the shielding.
When installing only one network module (
module is installed at the correct position on X13.
2
3
4
5
X3
X3
X13