EasyManua.ls Logo

Siemens FS20 - Processor Unit (19, FC2080)

Siemens FS20
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting and installation FC2080
Processor unit (19", FC2080)
6
264 | 354
Building Technologies
008851_s_en_
--
Fire Safety
2016
-
-
27
6.2 Processor unit (19", FC2080)
NOTICE
Damage to hardware
Remove the plug-in cards from the card cage first of all before installing the
processor unit (19", FC2080).
The following accessories are delivered along with the processor unit:
CPU card (FC2080) equipped with the network module (SAFEDLINK,CC)
Communication card (FC2080) equipped with the network module
(SAFEDLINK,CC)
3 metal cover places for module bus card slots
Adapter and 1.4 m flat cable for the power supply of the optional operating unit
LAN cable, 30 cm
Flat cable, 10 cm, for the module bus
2 supply cables red and blue, 1.6 m
One 4-pole signaling cable, 1.4 m
Self-adhesive plastic fasteners for the flat cable
2 shield connection terminal blocks
4 cage nuts with screws
Installation plate

Table of Contents

Other manuals for Siemens FS20

Related product manuals