10.2 Operating the control panel in STARTER (with the motor rotating)
Creating a Drive Project
10-148
SINUMERIK 802D sl Instruction Manual (BA), 05/2005 Edition
6FC5 397-0CP10-1BA0
Click
Infeed control priority.
Fig. 10-40 Incoming supply control priority
11.Click Incoming supply control priority (see Fig. 10-40).
Click
Return....
Fig. 10-41 Incoming supply control priority
12.Click Return... to terminate the connection to the drive unit (see Fig. 10-41).
Fig. 10-42 Returning the control priority
13.Confirm the query Return control priority? with Yes (see Fig. 10-42)
Now you are in the STARTER commissioning tool project, as shown in Fig. 10-43 below.