Ionics Instruments 2004 Page 8-18 DLM 30007-08 Rev. A
OXIDIZER INSTALLATION
ENTER
CLEAR
INSTALL: 0 DAYS AGO
INSTALL DT. : 12/23/98
CURRENT DT. : 12/23/98
ENT = SET W/CURRENT DT.
CLR = EXIT
FIGURE 8-9: OXIDIZER Status and INSTALLATION Screen
6. To change the percent left, highlight SET % LEFT and press ENTER.
Follow the on-screen instructions to change the percent left.
7. To change the installation date, highlight SET INSTALL DATE and
press ENTER. Follow the on-screen instructions to change the
oxidizer installation date.
8. Press CLEAR to return to the CONSUMABLES menu.
Acid Reagent
1. From the Consumables menu, use the arrows ( or ) to scroll to
ACID. Press ENTER to display the ACID INSTALLATION menu:
ENTER
CLEAR
INSTALL
SET % LEFT
FIGURE 8-10: ACID INSTALLATION Menu
2. With INSTALL highlighted, press ENTER to display the Acid Status
and Installation screen.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sievers TOC 800 and is the answer not in the manual?

Sievers TOC 800 Specifications

General IconGeneral
BrandSievers
ModelTOC 800
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals