44 • Installation of IP00 (OEM Kit) in a Cabinet
_____________________________________________________________________________________________
6.6 Insulation test (Option 4) (Terminals 25, 26, 27 and Leak)
When this option is installed, resistor units RU-7 (Un7,200V) or RU13 (7,200>Un13,800V) must be installed
as shown:
Figure 17 – Optional Insulation PCB Wiring
Figure 18 – RU-7, Resistor Unit – Dimensional Drawing