EasyManua.ls Logo

Suzuki DF70A - Fuel Injection System Troubleshooting

Suzuki DF70A
342 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fuel System: 1G-14
Fuel Injection System Troubleshooting
Z9J0111704003
Before starting the troubleshooting, make sure that:
There is no self-diagnostic code indication.
Emergency stop switch plate is set in place.
Step Action Yes No
1 Check fuel injector operating sound.
Check each injector for operating sound at engine
cranking. ()(Page 1G-21))
Do all 4 injector make operating sound?
Fuel injector circuit is in
good condition.
Go to step 2.
2 Check fuel injector resistance.
Turn ignition switch off, disconnect connectors from fuel
injectors.
Check for proper connection to fuel injector at each
terminal.
If good condition, check all fuel injector for resistance.
()(Page 1G-21))
Are all injectors in good condition?
Go to step 3. Faulty fuel injector.
3 Check fuel injector power supply.
Measure voltage between each “Gray” wire terminal of
fuel injector connector and engine body ground with
ignition switch turned “ON”.
Is voltage 10 – 14 V?
Go to step 4. “Gray” wire open or
shorted.
If it is in good
condition, check ECM
power source and
ground circuit.
4 Check Wire circuit.
Turn “OFF” ignition switch.
Disconnect connector from ECM.
Measure resistance between each “O/B”, “B/Br”, “R/W”,
“Lg” wire terminal of the fuel injector connector and body
ground.
Is resistance infinity?
Go to step 5. “O/B”, “B/Br”, “R/W”,
and/or “Lg” wire(s) are
shorted to ground.
5 Check Wire circuit.
Connect connector to ECM.
Measure voltage between each “O/B”, “B/Br”, “R/W”, “Lg”
wire terminal of fuel injector connector and body ground
with ignition switch turned “ON”.
Is voltage 0 V?
Go to step 6. “O/B”, “B/Br”, “R/W”,
and/or “Lg” wire(s) are
shorted to power supply
circuit.
6 Check fuel injector operating signal.
Connect connectors to each fuel injector and ECM with
ignition switch turned “OFF”.
Measure fuel injector operating signal between each “45”,
“71”, “47”, “59” terminal of ECM and body ground.
()(Page 1G-22))
Is voltage 6 – 10 V or over?
If check result is
satisfactory, substitute a
known-good ECM and
recheck.
“O/B”, “B/Br”, “R/W”,
and/or “Lg” wire(s) are
open circuit.
http://SelfFixer.com

Table of Contents

Other manuals for Suzuki DF70A

Related product manuals