EasyManua.ls Logo

WinGD X92 - Page 168

Default Icon
574 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance21242/A2
Winterthur Gas & Diesel Ltd.
6/ 6
21) Remove the chain blocks (94017004, Fig. 8) shackles (94019H) and eye bolts
(94045M1).
22) Operate the engine room crane to remove the chain (94205A) and the lifting tool
(94205).
23) Install all lubricating quills (refer to 21381).
24) Operate the cylinder lubricating pump on the applicable cylinder liner until oil flows
from all the lubricating grooves (refer to 21381, paragraph 5).
25) Install the piston rod gland, refer to 23031, paragraph 2.6.
26) Install the piston, refer to 34031 paragraph 3 34031.
27) Install the cylinder cover, refer to 27081 paragraph 4.
2017
Cylinder Liner: Removal and Installation (with optional tool)...................................

Table of Contents

Related product manuals