Mounting
35
1SVC 440 795 M1100
Mounting of the display module (flush mounting)
Figure: 11: Drill holes of the display system
X Drill and punch out two 22.5 mm diameter holes. The
diameter is the same as is normally required for control
circuit devices.
30
22.5
h
Observe the following technical requirements:
The hole spacing is 30 mm.
The maximum thickness of the front plate for mounting
the display base module must not exceed 6 mm.
The maximum thickness of the front plate for mounting
an expansion unit with a top-hat rail in addition to the
display base module must not be more than 4 mm.
Leave enough space at the side for the display base
module and, if necessary, the expansion unit.
In order to ensure protection to IP 65, the surface of the
mounting front must be even and smooth.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB CL Series and is the answer not in the manual?

ABB CL Series Specifications

General IconGeneral
ManufacturerABB
Rated Control Supply Voltage (Us)24 V DC
MountingDIN Rail
CategoryRelays
Contact ConfigurationSPDT
Coil Voltage24 V DC
Operating Temperature-40°C to +70°C
Electrical Life100 Thousand Cycles
OutputRelay

Related product manuals