EasyManua.ls Logo

ABB SmartTouch i-bus KNX

ABB SmartTouch i-bus KNX
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connection, installation / mounting
Product manual 2CKA00xx73xxxxx
35
6.5.3 Mounting in flush-mounted installation box in solid wall
Installation on the basis of the instructions on the enclosed plastering template:
Notice
See mounting instructions on the enclosed plaster and drilling template.
First the bottom part of the flush-mounted installation box must be pulled off and
installed flush-mounted.
2
1
43 5
6
Fig. 8: Mounting in solid wall
Installation on the basis of the instructions on the enclosed drilling template:
Continue with “Electrical connection“ on page 38 and “Installation“ on page 39.

Table of Contents

Related product manuals