4.Pre-operative preparation
45
4. Pre-operative preparation
4.1. Initial setup
4.1.1. Connection of tubes and cables
Step 1:
Connect CGO connection cable of the breathing system to
CGO interface in the left of the Anaesthetic Workstation.
Step 2:
Connect one end of the heating cable to the interface below
the breathing system; the other end is connected to the
interface marked “Heater” in the outlet module.