8210-00020 R1 109
Secure the Uprights to the Hopper
Note
Finger-tighten the bolts only.
1. Align the upright frame holes:
a. The top hole is aligned with hopper (4).
b. The bottom hole is aligned with the flashing (3) and hopper.
2. Drill holes through the cloth to match the frame holes.
3. Insert and finger-tighten the bolts.
Item
Description
1
1/4" x 1-1/4" Elevator Bolt (GR 2)
2
Hopper Cloth (with frame inserted)
3
Flashing
4
Hopper Weldment
5
1/4" Hex Bolt
FIELD LOADER S-DRIVE – PORTABLE GRAIN BELT CONVEYOR 3. ASSEMBLY