EasyManua.ls Logo

Allen-Bradley ControlLogix - Page 117

Allen-Bradley ControlLogix
203 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1756-6.5.3 - December 1999
PLC-5C to Logix5550 Controller: Scheduled Communications 8-15
You must now configure the consumed tags under the controller scope.
4. Double-click on Controller Tags in the project folder.
The Controller Tags window will appear.
5. Select the Edit Tags tab and create the following tag:
6. Right-click on the new PLC5_data tag.
Tag Name Type
PLC5_data Consumed_data

Table of Contents

Other manuals for Allen-Bradley ControlLogix

Related product manuals